Day 29

Big Tub has now got a shingled roof:

In a mostly successful effort at protecting the furniture from construction dust, Kim draped everything with plastic drop cloths in preparation of Big Door’s installation.  A piece of carpet from the old master bed room served to help protect the floor during the installation.

Big Door is in.  Buck will come by one day next week to reroute the electricals:

Somewhat stymied by the lack of a doorknob, the Boyz discuss alternate ways of getting the door open:

The framers will probably wrap up everything they can do tomorrow.  While the plumber may not come until Big Tub is actually delivered, the HVAC crew could come at any time.  I am the locksmith, and need to sign off now & go help the Boyz