Day 29
Big Tub has now got a shingled roof:

In
a mostly successful effort at protecting the furniture from construction dust,
Kim draped everything with plastic drop cloths in preparation of Big Doors
installation. A piece of carpet from the
old master bed room served to help protect the floor during the installation.

Big Door is in.
Buck will come by one day next week to reroute the electricals:

Somewhat stymied by the lack of a doorknob, the Boyz
discuss alternate ways of getting the door open:

The
framers will probably wrap up everything they can do tomorrow. While the plumber may not come until Big Tub
is actually delivered, the HVAC crew could come at any time. I am the locksmith, and need to sign off now
& go help the Boyz
![]()