As I had every reason to suspect, the concrete and brickwork turned out looking great.  I was especially proud of how good the brick under the bay window looked as the installation of such was my idea, and good aesthetically oriented ideas by Tom are few & far between:

These guys were fast, too because the concrete forms were still in place when I left for work that morning, and when I got home the forms had been removed & all three sets of steps were complete without a worker in sight.  The bricks were washed a couple of days later.

A crew from Cell-Pak stopped by and installed mirrors in both the master bath and dressing areas.  They also brought & installed a shower door.

Speaking of the shower, here’s a couple of pix of Rodney & Dennis’s floor-to-ceiling tile work:

If I had a camera with a wide-angle lens, you would be treated to a view of the soap & shampoo alcoves located to the right of the shower controls.  But I don’t , so you won’t!

With most of the work completed on Project Big Tub, A1 came & got their Porta-Potti.  Although it was clean and well maintained, hot afternoons will be pleasantly different without that distinct chemical smell wafting across the area.

The builder tells me he is trying to schedule his guys & the cultured marble pros for a tub fixin’ party.  I’ll post updates after the big get-together.